- Supplied and successfully installed all metering panels for 255 flats.
-
Supplied and successfully installed MCC/VFD panels fordrinking water Pumping stations.
- Supplied and commissioned STP plant electrical cabling and all instruments/sensors, installation, PLC control panels erection, integration, testing and connectivity to centralized monitoring through SCADA software.
- Completed Booster pumps wiring, control panels installation, testing and commissioning.
- Completed Concealed copper wiring of Havells make.
- Completed Fixing and Testing of Modular switches of Legrand / Havells / Anchor or equivalent make.
- Completed Power Outlets for Air Conditioners in all Bedrooms.
-
Completed Power Outlets for geysers in all Bathrooms Completed Plug points for Chimney, Refrigerator,Microwave ovens, Mixer/grinders in Kitchen.
-
Completed Plug points for Television in Drawing, Living & All Bed rooms in Drawing and Master Bedroom.
- Completed 3 Phase supply with individual meters Separate Miniature Circuit Breaker (MCB) for light and power circuits at main distribution box within each flat.
- Completed wiring provision for UPS connection.
- Completed Ethernet cabling CAT6 and telephone points for Landline/intercom connectivity.
-
Completed dish TV antenna co-axial cable to all bedrooms.and living rooms